Getting started – Vertical Stabilizer – Part 1

Today I started the build.  The first few steps consist of cutting the Spar Caps and getting the Vertical Stabilizer Rear spar set assembled.  Match drilling all the holes, deburring, and some countersinks.

Lots of putting pieces together and taking them apart to debur.  I’m probably spending too much time trying to clean up edges and remove all the sharps, but for now I’m ok with taking a bit more time to figure out what works best for me.

 

[inpost_galleria thumb_width=”200″ thumb_height=”200″ post_id=”183″ thumb_margin_left=”3″ thumb_margin_bottom=”0″ thumb_border_radius=”2″ thumb_shadow=”0 1px 4px rgba(0, 0, 0, 0.2)” id=”” random=”0″ group=”0″ border=”” show_in_popup=”0″ album_cover=”” album_cover_width=”200″ album_cover_height=”200″ popup_width=”800″ popup_max_height=”600″ popup_title=”Gallery” type=”yoxview” sc_id=”sc1492203046518″]