Tailcone – Part 3

So I’ll start off saying that I had a lot of camera issues this that are leading some some funky transitions due to lost footage or the camera turning off without me noticing.

Anyway, Starting off I got some help from my wife in flipping the tailcone over and getting it positioned in the garage so I could continue mounting the parts and pieces for the second side skin.  I keep “double-checking” how some of the parts overlap to make sure I am doing it correctly.  While mounting a few of the rear-ribs/bulkheads, I realize that a few of my J-channel stiffeners are actually just a little short of where they should be (edge distance in the images below). This was a bit crushing and required me to contact VANS support for advice.  I actually also did some searches on VAF and was glad I wasn’t the first one to make the same mistake :).   Read more

Tailcone – Part 2

First step in this video is the bending of the longerons.  I was worried about how this work work and was pretty cautious on how hard I was hitting them with the mallet.  HA!  I ended up really beating on these things pretty hard to get the “slight” bend that was necessary.  Give it 3-5 good hits with the rubber mallet while pre-loading the end of the channel, then take it out of the clamp and test fit it against the side skins.  Honestly after getting more aggressive I did get the proper bend in both of the longerons.  (Later on I was quite happy that when I installed the longeron and it fit perfectly!) Read more

Tailcone – Part 1

Started fabricating the parts and sub-assemblies for the Tailcone.  I elected to just purchased the pre-tapped tie-down stock from Cleaveland tool as it was cheaper than buying the actual tap (also didn’t know anyone that had a tap I could borrow).  Then I begin to cut the parts necessary for the bulkheads.  I will admit that in my excitement, I grabbed the incorrect 3/4 x 3/4 stock bar and cut the wrong piece.  Didn’t realize that till a bit later but already ordered and received a replacement piece.  This is a lot of measuring, marking, drilling, and making sure you don’t screw it up like I tend to do. Read more

Elevator – Part 9

Finally getting caught up with some video!  This is the final bits for Section 9.

Once again I was jumping around a little bit and decided to assemble and drill the hinge for one of the trim tabs.  This was more to keep me motivated than anything else as seeing the parts put together just makes me happy.

After I take a moment to enjoy my progress, I move on to riveting the trailing edge of the Elevators.  I decided not to alternate my rivets like I did on the rudder, and things went together quite nicely.  Below are a few pictures of the bucking bar I used to get the rivets near the trailing edge.

[inpost_galleria thumb_width=”200″ thumb_height=”200″ post_id=”349″ thumb_margin_left=”3″ thumb_margin_bottom=”0″ thumb_border_radius=”2″ thumb_shadow=”0 1px 4px rgba(0, 0, 0, 0.2)” id=”” random=”0″ group=”1″ border=”” show_in_popup=”0″ album_cover=”” album_cover_width=”200″ album_cover_height=”200″ popup_width=”800″ popup_max_height=”600″ popup_title=”Gallery” type=”yoxview” sc_id=”sc1502809108938″]

Next I begin rolling the leading edge of the elevators.  I quickly remember a post on VAF about using a socket inside JB Welded in the ends of a PVC pipe to assist with rolling the edge.   A quick trip to the Home Depot aviation department and I tried it out.  My first JB weld attempt failed on both sockets (you can see me re-do my work in the videos) however once I sanded the sockets and PVC pipe, the JB weld did a great job.  It really did make life a LOT easier rolling the edge by myself.

[inpost_galleria thumb_width=”200″ thumb_height=”200″ post_id=”349″ thumb_margin_left=”3″ thumb_margin_bottom=”0″ thumb_border_radius=”2″ thumb_shadow=”0 1px 4px rgba(0, 0, 0, 0.2)” id=”” random=”0″ group=”2″ border=”” show_in_popup=”0″ album_cover=”” album_cover_width=”200″ album_cover_height=”200″ popup_width=”800″ popup_max_height=”600″ popup_title=”Gallery” type=”yoxview” sc_id=”sc1502808300232″]

On to attaching the counterbalance weights and cleaning up a few missed rivets / making sure I didn’t miss anything else.  When I did get to the part where I needed to rivet the hinge onto the elevator and trim tab my squeezer and yokes were just not working.  I didn’t have enough clearance between the yoke and the eyelets of the hinge to squeeze the rivets without crushing / moving the eyelets.  Did some searches that were not really helpful, and decided I needed to modify my yoke slightly.  After some consideration, I decided to cut a small piece off my flat iron stock and JB weld it to the tip of my 4″ no hole squeezer.  Based on my recent experience with the sockets, compressing the JB weld would be fine, but a shearing force would allow me to remove the piece.  This worked perfectly and allowed me to quickly set these rivets.  (I saved the piece in case I need to repeat this again in the future.)

Once completed, I couldn’t help myself and showed off to the wife and kids how the parts go together.  🙂

Finished up the other Elevator and trim tab and stowed everything on my shelves so I can start working on the tailcone.  At this point my budget won’t allow me to order the wings until closer to November but now that the temp is getting reasonable (and the dehumidifier seems to really be helping make life comfortable in the garage), I have a feeling I’m going to be ramping up my time in the garage.  I’m sure I’ll be done with the tail well before the wings arrive.  The only question becomes where will I be storing all the stuff while I continue to build.  Already looking at where I can store parts (especially the horizontal stabilizer) while I work.  I have a feeling I’m going to have to do some massive cleanup / organization in my garage to make room for all my completed parts.

Elevator – Part 8

It feels like I have already done this once before.  Now that my left elevator has been primed, I can begin to dimple and begin final assembly.  Since I have already done this once, things go pretty quickly.  I don’t even have any issues riveting the skin to the rear spar this time.

All went great until I got to the point where I was ready to apply the proseal to the trailing edge and trim tabs.  I had ordered the 3.5 Oz ProSeal tube from Vans, just like I did for the rudder.  This time, the proseal came in a 6 oz tube, not the 3.5 oz tube I got the last time.  Only reason this is significant is that I have a SEMCO dispenser gun that came with the smaller retaining clip.  To use the dispenser, I had to transfer the mixed proseal into one of my empty smaller tubes.  (Looking back, the smaller tubes are labeled as 2.5oz.  *shrug*)

Either way, I now own the larger adapter so I don’t have to make more of a mess. I really do like the Dispending gun and the control you have in putting Proseal where you want it.

At this point, I now have to take a break for a while while the Proseal cures before I can finish riveting the trailing edge and attaching the trim tabs to the elevators.